Safety & RAMS.

Off-site manufacture designs risk out of the programme, less time at height, less hot work on site, fewer trades coordinating at the slab edge.

CE EN 1090-2Certified fabrication, EXC2
NSAIAudited annually
EliminatedHot works on site

Designed out, not managed

Less risk on site, because the work is done before it arrives.

Balconies arrive ready for install, one crane, one sequenced lift plan, one crew. No welding or cutting on site, no follow-on trades, no snag list.

Zerowelding or cutting on site
Zerofollow-on trades at the slab edge
Onecrane, one sequenced lift plan, one crew

Our site teams

An impeccable safety record, and the site teams behind it.

Extreme Balconies has an impeccable safety record, built on very strong, experienced site teams who plan and run every lift with care. It is one of the things that really sets us apart from the competition.

Toolbox talk before a lift, Extreme Balconies crew

Next step

Talk through safety and sequencing for your scheme.

Not every scheme needs a meeting straight away. Start with the route that matches where your project is now.

Programme

See how we sequence an install

Design, manufacture and crane-sequenced install, see our process end to end.

View our process

Project review

Request RAMS & a package review

A 20-minute review with an engineer covering sequence, lift plan and site constraints.