Skip to content

Case study · Cairn Homes

Seven Mills, Dublin.

At Seven Mills, Cairn needed balcony delivery to match the pace and scale of a major residential programme without leaving multiple trades to resolve details at the slab edge.

0Balconies delivered
0Installed in one day
0Weeks saved vs in-situ
0Defects at handover

The brief

One programme, one accountable balcony supplier.

Extreme Balconies supplied a modular package that brought design, manufacture, finish and installation into one controlled sequence, helping the site move faster with fewer handover issues. Rather than coordinating separate trades for structure, waterproofing, finishing and installation at the slab edge, Cairn dealt with one accountable partner for the whole balcony scope.

Client
Cairn Homes
Location
Dublin, Ireland
Sector
Residential

The solution

52 balconies, one crane, one working day.

Balconies arrived ready for install, one crane, one sequenced lift plan, one crew. No welding or cutting on site, no follow-on trades, no snag list.

6 minaverage lift cycle
Eliminatedhot works on site
Zerofollow-on trades at the slab edge
Brian Heverin
“We have worked with Extreme on a number of high-density projects across Dublin city. They offer everything we need under one roof from design and manufacture to installation.

Extreme excel at innovation and we are very happy with the quality of service and products we have received.”
Brian Heverin Construction Director, Cairn Homes

More projects

Delivered at scale, across Dublin.

Next step

Planning a scheme at this scale?

Not every scheme needs a meeting straight away. Start with the route that matches where your project is now.

Project review

Book a balcony package review

A review with our commercial and design team covering your drawings, sequence and install constraints.

Start a project
Call Start a project